Service status & availability Crypto-only billing · No-KYC signup

Ryzen bare metal

Ryzen 5 3600 dedicated server

A compact starting point for a workload you can already size: 6 cores, 64 GB memory and local NVMe, from $69 per thirty-day term.

ProcessorRyzen 5 3600
Compute6c / 12t
Memory64 GB DDR4
Storage2×512 GB NVMe
Network1 Gbps unmetered
AddressingIPv4 /29 · IPv6 /64

What this configuration is suited to

Ryzen 5 3600 balances dedicated compute with local NVMe. Choose it when predictable CPU scheduling, fixed transfer cost and direct control of the operating system matter more than minute-by-minute elasticity.

Included with the server

  • Unmetered network port
  • IPv4 /29 block
  • IPv6 /64 allocation
  • Full IPMI/KVM access
  • Baseline DDoS protection

Operating systems

Ubuntu, Debian, Rocky Linux, AlmaLinux, Windows Server, Proxmox VE, VMware ESXi, TrueNAS, pfSense, Custom ISO. Commercial software licenses are not included unless stated on an order.

Available locations

Run it in Dallas, Ashburn or Portland.

Provisioning estimates can vary by hardware availability. A final region check happens before the ledger is debited.

Before you choose

Where this configuration makes sense.

3 min guide

Keep a small application stack easy to understand

Consider this configuration for a focused web application, a development environment or a pilot that benefits from its own physical host. Write down the services you will run and their peak memory and disk requirements. A small stack is easier to size when logs, scheduled jobs and supporting services are included rather than treated as free capacity.

The useful starting question is whether the complete workload fits with recovery headroom. Dedicated hardware provides control, but it does not automatically make an undersized application responsive or an unmonitored deployment reliable.

Pay particular attention to disk growth

This is the smallest NVMe allocation in the catalogue. The two devices offer a layout choice, not a preconfigured redundancy guarantee. Allow for the operating system, application data, package caches, database logs and temporary exports before deciding the working dataset fits.

A test environment can grow quickly when it retains build artifacts or repeated database copies. Define cleanup and retention at the beginning. Keep required recovery copies outside the machine instead of counting spare local space as a backup service.

Use a pilot to answer the sizing question

Record representative busy periods, not only idle averages. Check memory pressure, CPU saturation, disk growth and the time needed to restore the application. For a web workload, test the application with realistic requests and dependencies; a count of hosted domains says little about its resource demand.

The 1 Gbps port is a service tier, not a latency result for your users. Choose a region using the application’s dependencies and measurements from relevant networks.

Know what would justify the next configuration

Compare Ryzen 7 5800X when its additional cores and larger NVMe devices address an observed constraint. Compare Xeon E-2276G when the listed ECC configuration is important and its smaller memory allocation is sufficient. Those alternatives change different resources; neither is an automatic upgrade for every workload.

There is no self-service in-place configuration change. Keep deployment automation, backups and a migration route ready if the pilot outgrows the machine. Select the smallest configuration that meets the complete requirement, including moving out again.

Direct answers

Questions before you order

Is this only suitable for testing?

No fixed environment label determines suitability. A measured workload may fit; verify peak demand, storage growth, recovery time and operating requirements before choosing it for production.

When should I choose the Ryzen 7 5800X instead?

When extra cores or the larger listed NVMe devices solve a real constraint. Compare the full configuration and cost rather than assuming a higher model number guarantees a better result.