Service status & availability Crypto-only billing · No-KYC signup

Dedicated workload

Database dedicated server rental

Rent a complete machine for a database you operate. Compare memory, local NVMe devices and recovery requirements before choosing a processor or committing to a larger allocation.

Hardware priorities

  • ECC memory — verify it against the application, dataset and recovery objective.
  • IOPS — verify it against the application, dataset and recovery objective.
  • backup recovery — verify it against the application, dataset and recovery objective.

Selection rule

Start with ECC memory, IOPS, backup recovery. Leave headroom for recovery work, then compare the fixed monthly price with the same workload's metered alternatives.

Deployment path

  1. Select a configuration and US region.
  2. Choose Ubuntu or attach a custom ISO.
  3. Add an SSH key and fund the USD ledger with crypto.
  4. Confirm the installation window and wait for completed delivery before moving production traffic.

Shortlist

Configurations for this workload.

ProcessorCoresMemoryStorageWeeklyMonthlyAction
Xeon E-2388GXeon bare metal
8c/16t
64 GB ECC
2×1 TB NVMe
$26per week
$87per month
Configure →
EPYC 7443PEPYC bare metal
24c/48t
256 GB ECC
2×3.84 TB NVMe
$62per week
$207per month
Configure →
EPYC 7513EPYC bare metal
32c/64t
256 GB ECC
4×3.84 TB NVMe
$79per week
$263per month
Configure →

Before you choose

Choose hardware for the job you need.

3 min guide

Buy for the workload, not the database name

Bring a workload profile: database engine and version, active data size, peak memory use, concurrent queries, write volume and growth. Include indexes, transaction logs, temporary space and maintenance jobs. A small business database and a reporting warehouse can need very different machines even when they use the same software.

Identify the constraint you are trying to change. If an existing system waits on storage or a remote application, buying more cores is not evidence that the problem will disappear. Use your own query mix and a representative dataset to establish acceptance criteria for the new host.

Compare three different allocations

These candidates offer different memory and disk allocations; they are not ranked by transactions per second. Listed raw capacity is not usable database space after your chosen redundancy.

  • Xeon E-2388G: 64 GB of listed ECC memory and 2 TB raw NVMe capacity. A smaller candidate when the measured workload fits comfortably.
  • EPYC 7443P: 256 GB of listed ECC memory and 7.68 TB raw NVMe capacity. Compare it when memory or data growth excludes the smaller configuration.
  • EPYC 7513: four NVMe devices and 15.36 TB raw capacity. Consider it when the intended disk layout needs more devices, then confirm the actual configuration.

Agree what protects the data

Ask for the drive model and endurance where sustained writes matter. The catalogue does not publish measured IOPS, commit latency or a database benchmark. Specify the disk layout and recovery requirement instead of assuming that NVMe or ECC makes a complete resilience plan.

A single rental is one physical host, not a managed database cluster. Replication, failover, database-aware backups and restore testing remain your responsibility unless separately agreed. Confirm any network separation required between database nodes; a public port or a second machine does not include a private replication network.

Price the complete deployment and migration

Compare the rental alongside database licensing, backup storage and any quoted options. Check software licensing against the exact processor allocation. Select the operating system and confirm its release, disk layout and access method before installation; renting hardware does not include database administration.

Choose a region against the application's network needs and confirm the model's delivery window. Preserve the existing database until the new host passes your checks and a restore has been demonstrated. A queued installation request is not a completed migration or a reason to remove the old copy.

Direct answers

Questions before you order

Do you promise a query rate or database latency?

No measured database performance is published. Set acceptance criteria using your engine, schema, query mix and dataset; a hardware specification alone cannot establish the result.

Is database management or automatic failover included?

No. This is dedicated hardware rental. Confirm any separately agreed assistance, and plan administration, replication, backups and recovery before moving production data.